Factory & Quality

Sports Nutrition Manufacturing & Quality

Explore our Guangzhou production and laboratory photographs. Review factory credentials, product specifications and the batch documents to discuss for your sports nutrition project.

Meichuntang manufacturing equipment in the Guangzhou facility

Guangzhou facility

Factory Scale & Production Planning

Our factory supports multiple formats, including effervescent tablets, compressed tablets, capsules and functional powders.

Overall factory area
30,000 m²
Class 100,000 clean production workshop
5,000+ m²
Supplement manufacturing experience
18+ years

For a capacity and scheduling estimate, share your first-order and repeat-order quantities in finished retail units. Include tablets or capsules per bottle, tablets per tube, or grams per stick and sticks per carton. We review the production schedule and packaging requirements for your configuration.

Wide view of stainless-steel equipment in a production workshop
Production equipment on the workshop floor.

Production Workshops & Equipment

Our production and packing areas handle different stages of an order, including forming tablets, filling retail packs and preparing finished cases for dispatch.

Factory gallery

Production and Facilities

Quality

What we can review with your team

R&D

We review the formula and serving requirements, then discuss sample evaluation for flavor, mixing or dissolution.

Quality Control

Discuss raw material specifications, production checks and batch traceability with our team.

Testing & Documentation

Ask about batch COAs, product specifications and the testing documents available for your formula and target market.

Laboratory technician handling sample materials at a workbench next to white tubes
A technician working with samples at the laboratory bench.

How We Check Your Order

We review sample and batch requirements with you before production. The checks at each stage depend on the dosage form and the finished product specification.

  1. Verify materials

    Review incoming ingredients against the approved raw material specifications.

  2. Monitor production

    Check in-process parameters for the dosage form and maintain batch records.

  3. Test the finished batch

    Review applicable finished-product results against the agreed release specification.

  4. Inspect packaging and release

    Review packaging, coding and release documentation before dispatch.

Documentation

Quality Documents for Your Project

Share your buyer or distributor checklist early so we can confirm the documents, test scope and timing for your project.

Ingredient & Finished Product Specifications

Review the agreed ingredient grade and requirements for the finished product, including serving size, approved packaging and any relevant release criteria.

Batch Certificate of Analysis (COA)

Check that the product and lot number match your order. Review which parameters were tested and how the results compare with the agreed specification limits.

Third-Party Test Reports

If your project requires independent testing, tell us which parameters you need, such as active content, microbiology or heavy metals. Confirm the laboratory, methods and timing before production.

Batch Traceability

Share the records your quality team needs and confirm how lot codes will appear on tubes, sachets or cartons. Match that information to the relevant batch documents.

Packaging & Artwork Specifications

Confirm net fill, retail pack count, container or pouch dimensions, approved artwork and lot/date coding. Keep the agreed packaging details aligned with the production specification.

Export & Buyer Documentation

Share your destination and importer checklist. We confirm which documents can be supplied, the issuing party where applicable, and whether additional testing or review is needed.

Certification scope

Factory Certifications & Registrations

The SGS GMP certificate CN24/00001188 identifies Guangzhou Meichun Tang Pharmaceutical Technology Co., Ltd. at Building C, No. 6 Zhengnong Road, Guangzhou. The certificate lists health food tablets, granules and hard capsules among the assessed activities and gives an end date of February 21, 2027, subject to satisfactory surveillance audits.

Confirm the applicable manufacturing entity, certificate and product scope for your order with our team.

Request Documents for Your Product

Share your buyer checklist, target market and required tests. We confirm document availability and any additional testing scope for your project.

Send Your Document Checklist